Open Workshop Setup -- Wikifab
Open Workshop Setup -- Wikifab Basic Data Category: Projects URL (first publication): https://wikifab.org/wiki/Open_Workshop_Setup
no no
Other
Design files are in original format: No Free redistribution is allowed licence: No
|
Inhaltsverzeichnis
- 1 Description
- 1.1 Open Workshop Setup
- 1.1.1 Description
- 1.1.2 Sommaire
- 1.1.3 Sommaire
- 1.1.4 Introduction
- 1.1.5 Étape 1 - Space selection & preparation
- 1.1.6 Étape 2 - prepare tools & materials
- 1.1.7 Étape 3 - Fix the boards to the wall
- 1.1.8 Étape 4 - Fix tools and materials to the boards and finish up
- 1.1.9 Étape 5 - Tips & WATCH YOUR TOOLS
- 1.1 Open Workshop Setup
- 2 + General Reviews
Description
Open Workshop Setup
- 1
Creation de Catégories :
Description
Create a simple workspace setup to manage and organise your tools and materials
Create a simple workspace setup to manage and organise your tools and materials
Sommaire
Sommaire
Workshop, Tools, Materials, Open Source Hardware, Management en none 0
Introduction
Creating a organised workshop is key for your active work on projects.
So we came up with a simple and cheap way of doing it, the more materials you upcycle to build it, the more you can reduce the costs.
Étape 1 - Space selection & preparation
- You need a space where you can work, so at least 8x bigger than your original workshop spot
- use a corner of the room (about 2.0x1.0m Space minimum)
- keep lights and accessebillity in mind
- kreate an overview of tools and materials you have
- start looking for a good sized plywood for your tools (big) and your small materials (small)
- use a solid table as base for the construction (at least 90cm high and 70cm deep)
- have a powerplug close to it
- cut the wood sheets
Étape 2 - prepare tools & materials
- sort materials and tools by type and usage
- cut the bottles to fill with materials (screws, bolts, nuts, washers, hooks, rivets etc.)
- place the tools in order on the ground to the sheet (try different setups)
- draw a fine line with a pencil around the tools
- cut the parts for the box and the skrewdriver board and add it to the wall setup
- nail everything to the board and remove the tools
Étape 3 - Fix the boards to the wall
- nail the board to the wall. (you can also use screws)
- Build up some boxes for materials like markers.
- Draw the shapes of the materials and tools for easy identification after use.
- fix the timber board under the board, right above the table.
Étape 4 - Fix tools and materials to the boards and finish up
- Tools and materials should be fixed based on there shapes.
- Balance both sides to reduce more weight on one side
Étape 5 - Tips & WATCH YOUR TOOLS
- Always ensure the open training space is neat and clean.
- Keep off children near the work space.
- The work space should be dust free at all times
- Ensure to bring back tools and materials taken from the work space.
- Should be free from water since some of the tools rusts.
Published
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
Pour participer la traduction de la plateforme dans d'autres langues, rendez-vous sur .
+ General Reviews 